Coker Heater
– #2 Coker #3 Heater Convection Section Full Re-tube
– Thirty-six (36) 347H tubes replaced (62’ Long)
– Tubes finned and bare
– 2 headers built and installed
– Convection box welding w/100% X-ray
– 0% reject rate
– Convection door refractory replaced
– Burner box refractory repairs
– Radiant tube supports repairs Zero incidents, zero first aids, and zero recordables. Safely executed a full heater retube with our crane assisted tube extractor.
Related Projects
New Cement Plant Completion
Cement/Lime
New Cement Plant Completion
Cement ID fan Design, upgrade, and replacement
Cement/Lime
Cement ID fan Design, upgrade, and replacement
New A/I controlled classifier erection and install
Cement/Lime
New A/I controlled classifier erection and install
Baghouse engineering, removal and install
Cement/Lime
Baghouse engineering, removal and install
Plant expansion and renovation
Aerospace
Plant expansion and renovation
ACID Plant shutdown
Chemical
ACID Plant shutdown
Waste Heat Boiler
Ferrous & Non-ferrous Metals
Waste Heat Boiler
Copper Cleaner Project
Ferrous & Non-ferrous Metals
Copper Cleaner Project
Hydrogen Heater
Hydrogen Heater
Crude Heater (B-4)
Crude Heater (B-4)
Get Your Project
Started Today!
87 S. William Dillard Dr.
Gilbert, Az 85233
Ben Ridenour
benr@recon-inc.com
6700 N. Oracle Rd. Ste 238
Tucson, AZ 85704
Ben Ridenour
benr@recon-inc.com
10741 Los Alamitos Blvd.
Los Alamitos, Ca 90720
Brennan Anderson
banderson@recon-inc.com
976 West 850 South
Woods Cross, Utah 84087
David Drorbaugh
ddrorbaugh@recon-inc.com
2020 marks 30 years of being in business for Recon
All rights reserved to Recon Inc. 2025