We Do It Safely,
Or Not At All.
Project
View all of our safety certifications and learn about our required training programs for all of our workers.
Crude Heater (B-4)
Complete boiler retube consisting of a total of 672 tubes (580 bare, 78 finned and 14 pre-assembled in headers). Worked with Boiler Tubes of America (BTA) to engineer and provide a like-in-kind replacement. Scope of work included procurement of all materials as well as self-performing all mechanical and refractory work. Successful hydro test was performed on the first attempt.
Related Projects
New Cement Plant Completion
Cement/Lime
New Cement Plant Completion
Cement ID fan Design, upgrade, and replacement
Cement/Lime
Cement ID fan Design, upgrade, and replacement
New A/I controlled classifier erection and install
Cement/Lime
New A/I controlled classifier erection and install
Baghouse engineering, removal and install
Cement/Lime
Baghouse engineering, removal and install
Plant expansion and renovation
Aerospace
Plant expansion and renovation
ACID Plant shutdown
Chemical
ACID Plant shutdown
Waste Heat Boiler
Ferrous & Non-ferrous Metals
Waste Heat Boiler
Copper Cleaner Project
Ferrous & Non-ferrous Metals
Copper Cleaner Project
Coker Heater
Coker Heater
Hydrogen Heater
Hydrogen Heater
Get Your Project
Started Today!
87 S. William Dillard Dr.
Gilbert, Az 85233
Ben Ridenour
benr@recon-inc.com
6700 N. Oracle Rd. Ste 238
Tucson, AZ 85704
Ben Ridenour
benr@recon-inc.com
10741 Los Alamitos Blvd.
Los Alamitos, Ca 90720
Brennan Anderson
banderson@recon-inc.com
976 West 850 South
Woods Cross, Utah 84087
David Drorbaugh
ddrorbaugh@recon-inc.com
2020 marks 30 years of being in business for Recon
All rights reserved to Recon Inc. 2025