We Do It Safely,
Or Not At All.
Project
View all of our safety certifications and learn about our required training programs for all of our workers.
Crude Heater (H-1)
Modification of the Crude Heater convection section to upgrade the upper intermediate tubesheet and supports to 304 SS, replace (24) finned 9-Cr tubes, and add (2) new rows of 9-Cr convection tubes. During the Turnaround, smart pig data revealed some radiant section tube replacements were required. RECON completed radiant section tube replacements, thermocouple installations and refractory repairs within the turnaround schedule.
Related Projects
New Cement Plant Completion
Cement/Lime
New Cement Plant Completion
Cement ID fan Design, upgrade, and replacement
Cement/Lime
Cement ID fan Design, upgrade, and replacement
New A/I controlled classifier erection and install
Cement/Lime
New A/I controlled classifier erection and install
Baghouse engineering, removal and install
Cement/Lime
Baghouse engineering, removal and install
Plant expansion and renovation
Aerospace
Plant expansion and renovation
ACID Plant shutdown
Chemical
ACID Plant shutdown
Waste Heat Boiler
Ferrous & Non-ferrous Metals
Waste Heat Boiler
Copper Cleaner Project
Ferrous & Non-ferrous Metals
Copper Cleaner Project
Coker Heater
Coker Heater
Hydrogen Heater
Hydrogen Heater
Get Your Project
Started Today!
87 S. William Dillard Dr.
Gilbert, Az 85233
Ben Ridenour
benr@recon-inc.com
6700 N. Oracle Rd. Ste 238
Tucson, AZ 85704
Ben Ridenour
benr@recon-inc.com
10741 Los Alamitos Blvd.
Los Alamitos, Ca 90720
Brennan Anderson
banderson@recon-inc.com
976 West 850 South
Woods Cross, Utah 84087
David Drorbaugh
ddrorbaugh@recon-inc.com
2020 marks 30 years of being in business for Recon
All rights reserved to Recon Inc. 2025