We Do It Safely,
Or Not At All.
Project
View all of our safety certifications and learn about our required training programs for all of our workers.
Hydrogen Heater
Hydrogen Unit Boiler auxiliary boiler full retube consisting of the following:
– 1,052 tubes replaced in quarter sections
– 2 waterwall panels built and installed
– All membrane materials replaced
– Complete refractory demolition and reinstallation
– Removal and replacement of skin, scallop plates and convection plates
Related Projects
New Cement Plant Completion
Cement/Lime
New Cement Plant Completion
Cement ID fan Design, upgrade, and replacement
Cement/Lime
Cement ID fan Design, upgrade, and replacement
New A/I controlled classifier erection and install
Cement/Lime
New A/I controlled classifier erection and install
Baghouse engineering, removal and install
Cement/Lime
Baghouse engineering, removal and install
Plant expansion and renovation
Aerospace
Plant expansion and renovation
ACID Plant shutdown
Chemical
ACID Plant shutdown
Waste Heat Boiler
Ferrous & Non-ferrous Metals
Waste Heat Boiler
Copper Cleaner Project
Ferrous & Non-ferrous Metals
Copper Cleaner Project
Coker Heater
Coker Heater
Crude Heater (B-4)
Crude Heater (B-4)
Get Your Project
Started Today!
87 S. William Dillard Dr.
Gilbert, Az 85233
Ben Ridenour
benr@recon-inc.com
6700 N. Oracle Rd. Ste 238
Tucson, AZ 85704
Ben Ridenour
benr@recon-inc.com
10741 Los Alamitos Blvd.
Los Alamitos, Ca 90720
Brennan Anderson
banderson@recon-inc.com
976 West 850 South
Woods Cross, Utah 84087
David Drorbaugh
ddrorbaugh@recon-inc.com
2020 marks 30 years of being in business for Recon
All rights reserved to Recon Inc. 2025