We Do It Safely,
Or Not At All.
Project
View all of our safety certifications and learn about our required training programs for all of our workers.
Steel furnace off gas ducting supply and replacement
RECON supplied & installed nearly a dozen 7.5’D expansion joints, replaced or refurbished duct supports in two DES Ducts, field fabricated & installed 14’D double manifold, replaced a vertical water-cooled duct in support of Gerdau’s Melt Shop shut down, and supplied & managed large cranes. The complete work scope was done at-height and during continuous rain downpours.
Work was fast tracked during a 10-day plant outage. Work by RECON included site assembly and completion of fabrication of ductwork sections not completed by GERDAU’s shop fabricator in time for the outage.
Related Projects
Copper Cleaner Project
Ferrous & Non-ferrous Metals
Copper Cleaner Project
Waste Heat Boiler
Ferrous & Non-ferrous Metals
Waste Heat Boiler
Converter Retrofit Project (Emission controls upgrade)
Ferrous & Non-ferrous Metals
Converter Retrofit Project (Emission controls upgrade)
Gas/Gas Heat Exchanger
Ferrous & Non-ferrous Metals
Gas/Gas Heat Exchanger
Smelting Furnace Rebuild
Ferrous & Non-ferrous Metals
Smelting Furnace Rebuild
Wet Gas Cleaning Plant
Ferrous & Non-ferrous Metals
Wet Gas Cleaning Plant
Get Your Project
Started Today!
87 S. William Dillard Dr.
Gilbert, Az 85233
Ben Ridenour
benr@recon-inc.com
6700 N. Oracle Rd. Ste 238
Tucson, AZ 85704
Ben Ridenour
benr@recon-inc.com
10741 Los Alamitos Blvd.
Los Alamitos, Ca 90720
Brennan Anderson
banderson@recon-inc.com
976 West 850 South
Woods Cross, Utah 84087
David Drorbaugh
ddrorbaugh@recon-inc.com
2020 marks 30 years of being in business for Recon
All rights reserved to Recon Inc. 2024