We Do It Safely,
Or Not At All.
Project
View all of our safety certifications and learn about our required training programs for all of our workers.
Waste Heat Boiler
Multiple projects 2012 thru current.
Waste heat boiler inspect and repair projects. Scope of work included UT surveys, overlay of tubes, removal/replacement of single tube replacements, removal/replacement of division walls in the hopper, vertical Expansion Joint replacement, Horizontal Expansion Joint replacement, miscellaneous code piping repairs in the boiler boundary limit, and miscellaneous refractory repairs within the boiler.
Related Projects
Copper Cleaner Project
Ferrous & Non-ferrous Metals
Copper Cleaner Project
Converter Retrofit Project (Emission controls upgrade)
Ferrous & Non-ferrous Metals
Converter Retrofit Project (Emission controls upgrade)
Steel furnace off gas ducting supply and replacement
Ferrous & Non-ferrous Metals
Steel furnace off gas ducting supply and replacement
Gas/Gas Heat Exchanger
Ferrous & Non-ferrous Metals
Gas/Gas Heat Exchanger
Smelting Furnace Rebuild
Ferrous & Non-ferrous Metals
Smelting Furnace Rebuild
Wet Gas Cleaning Plant
Ferrous & Non-ferrous Metals
Wet Gas Cleaning Plant
Get Your Project
Started Today!
87 S. William Dillard Dr.
Gilbert, Az 85233
Ben Ridenour
benr@recon-inc.com
6700 N. Oracle Rd. Ste 238
Tucson, AZ 85704
Ben Ridenour
benr@recon-inc.com
10741 Los Alamitos Blvd.
Los Alamitos, Ca 90720
Brennan Anderson
banderson@recon-inc.com
976 West 850 South
Woods Cross, Utah 84087
David Drorbaugh
ddrorbaugh@recon-inc.com
2020 marks 30 years of being in business for Recon
All rights reserved to Recon Inc. 2024