We Do It Safely,
Or Not At All.
Project
View all of our safety certifications and learn about our required training programs for all of our workers.
Converter Retrofit Project (Emission controls upgrade)
Complete retrofit on operating Copper Smelting plant. Performed all civil, Mechanical, Piping, Refractory, and Electrical on project. Installed new precipitator, baghouses, 17’x32;’ converters (3), spray chambers, belts, screw feeders, overhead cranes, siding, and all ancillary equipment. Consisting of the following commodity quantities 90,368 ft of pipe, 240,000 ft of wire, 3650 tons of structural steel, 4,722 ft of large diameter ducting, 3,200 cubic yards of concrete, 1,340 tons of heavy equipment. All work was performed in an operating facility next to operating equipment. project was fast tracked for an 18 month time frame with 2 (30) outages scheduled for tie ins. Upon completion and implementation this facility is now operating at a 97% emission capture rate, ranking it in the top 5 globally on cleanest copper smelting facilities.
Related Projects
Copper Cleaner Project
Ferrous & Non-ferrous Metals
Copper Cleaner Project
Waste Heat Boiler
Ferrous & Non-ferrous Metals
Waste Heat Boiler
Steel furnace off gas ducting supply and replacement
Ferrous & Non-ferrous Metals
Steel furnace off gas ducting supply and replacement
Gas/Gas Heat Exchanger
Ferrous & Non-ferrous Metals
Gas/Gas Heat Exchanger
Smelting Furnace Rebuild
Ferrous & Non-ferrous Metals
Smelting Furnace Rebuild
Wet Gas Cleaning Plant
Ferrous & Non-ferrous Metals
Wet Gas Cleaning Plant
Get Your Project
Started Today!
87 S. William Dillard Dr.
Gilbert, Az 85233
Ben Ridenour
benr@recon-inc.com
6700 N. Oracle Rd. Ste 238
Tucson, AZ 85704
Ben Ridenour
benr@recon-inc.com
10741 Los Alamitos Blvd.
Los Alamitos, Ca 90720
Brennan Anderson
banderson@recon-inc.com
976 West 850 South
Woods Cross, Utah 84087
David Drorbaugh
ddrorbaugh@recon-inc.com
2020 marks 30 years of being in business for Recon
All rights reserved to Recon Inc. 2024