New A/I controlled classifier erection and install

Cement/Lime |Rigging
CalPortland-Project-Image
Hours
7,600 Man Hours
Safety
0 Safety Incidents
Location
Mojave, CA
Value
$775,000

RECON executed the vertical roller mill classifier upgrade project in 2018. The project included pre-construction and outage work: Design, Engineering, fabrication, and installation of new outlet duct, feed chute, stairways, and platforms. Pre-outage assembly of new FLS ROKSH 90 Classifier on an engineered base frame provided by RECON. Installation of Wear Protection tiles and compound. Completed classifier replacement within a 10-day outage.